TURNER-KIEWIT JV & GREATER ORLANDO AVIATION AUTHORITY SOUTH TERMINAL C LANDSIDE – GMP 9S.1, PARKING GARAGE (BALANCE OF PROJECT)
Turner-Kiewit, Joint Venture (TK) will be bidding the GMP 9S.1, PARKING GARAGE (BALANCE OF PROJECT). The bid packages will be: Acoustic Ceiling Tile and Wall Panels; Carpet and Resilient Flooring; Ceramic Tile and Stone; Doors/ Frames/Hardware; Drywall/Insulation/Wire Mesh; Entrance Floor Grilles; Interior Glazing; General Requirements; Low Voltage; Masonry; Metal Canopy Roof; Metal Ceilings; Metal Wall Panels; Misc. Metals; Millwork & Countertops; Painting; Resinous/Epoxy Flooring; Roofing & Assoc. Rough Carpentry; Signage; Specialties; Striping & Pavement Marking; Terrazzo Flooring.
TK invites prime subcontractors to complete and submit Turner’s prequalification. The pre-qualification process can be found at TK’s Project website, http://www.tkgoaa.com. The website will contain all announcements and any associated dates regarding the South Terminal C, Landside Project.
Turner-Kiewit is committed to exceeding GOAA’s MWBE, DBE, LDB/VBE goals on the project. Goals will be established for each scope of work to maximize MWBE, DBE, LDB/VBE participation. We invite and encourage MWBE, DBE, LDB/VBEs to bid.
Bid Package Release Date: June 15, 2018 Pre-Bid/Matchmaker
Meeting: July 12, 2018
Location: Turner-Kiewit Trailer Alpha Conference Room 11118 Canal Road Orlando, FL 32824 Time: 2:00 pm – 4:30 pm Bid Package Due Date: July 20, 2018
For more information, please contact Jessica Hudson at jeshudson @tcco.com.
Turner-Kiewit is an equal employment opportunity employer–Minorities/ individuals/ females/veterans/individuals with disabilities/ sexual orientation/gender identity. VEVRAA Federal Contractor.